Christmas:
On Christmas Eve Paul and I went to my sister's in Connecticut:
with Mandy in tow:
I worked on my long-neglected cabled sweater (started in March) in the car:
More on this later (hint: I finished it!!!).
Knitted gifts were all a hit but only got pictures of the mukluks for my nephews:
They loved them, immediately putting them on and then disproving my attempt at non-slippage by sliding across the kitchen floor (after I told them I had put the stuff on the bottom so they wouldn't slip). What can I say? I tried. And left them with a warning to be particularly careful on the stairs. But they wore them all day and that leads me to believe that they were warm and comfy.
Lots of cooking going on at my sister's:
![]() |
| Making sugar cookies (and adding sprinkles to look like Aunt Liz) |
![]() |
| More sugar cookies... |
![]() |
| More sugar cookies (we all took turns at icing and sugar) |
![]() |
| The biggest food hit - pigs in a blanket |
![]() |
| Mmmmmm.....dessert! (including a yummy gingerbread trifle) |
Home Improvement #1:
Paul wanted to tackle a couple of projects during his time off from work. The first was changing our fireplace into a wall-with-mantle-and-heat-shield-so-we-can-use-the-stove-and-put-the-tv-on-the-wall. Here it is when we first moved in 4 years ago:
![]() |
| That white section used to have a piece of metal over it. Blech. |
![]() |
| Another use for the level |
![]() |
| ANOTHER use for the level (straight edge for cutting drywall) |
![]() |
| Top on Paul's priority list was hiding the tv wires... |
And now it looks like this:
Just a little bit left to do... putting in some side wood to complete the mantel and then, after heating season, putting stone or tile over the brick. We. LOVE. IT! (That black thing directly under the mantel is the heat shield that is required if you have a wood stove that sticks out of the fireplace. We might take it down in the summer.)
Home Improvement #2:
The stairway. Ugh. We've been dreading painting the stairway/hallway/ceiling area since it is very high up and required changing the light fixture. We are both a little leary of heights and don't have a ladder tall enough etc. So, Paul built this:
Which meant we had to hurry up and get this done unless we wanted to keep climbing under this in our pajamas for several evenings. It was fairly sturdy and we cranked out the light change and the ceiling and wall painting in about 24 hours.
![]() |
| That's the new light. |
In the car on the way to xmas eve and then in the several days after, I finally finished my Brigid Jacket from Vintage Modern Knits: Contemporary Designs Using Classic Techniques
:
I love how it came out. This book has several patterns that I'd like to knit eventually. BUT... see my ramblings later on in this post.
And at The Spinning Room on Saturday a new knit-a-long started, which I joined in on:
These will be the Socks of Kindness and I'm making them with the Periwinkle Sheep Watercolors sock yarn in the Rhinebeck 2011 colorway.
And finally, I started the Sycamore Vest by Hannah Fettig using the Cascade 220 Sport:
![]() |
| Sans buttons, of course... and the sleeves ARE the same length. They just don't look it in this picture.... |
I love how it came out. This book has several patterns that I'd like to knit eventually. BUT... see my ramblings later on in this post.
And at The Spinning Room on Saturday a new knit-a-long started, which I joined in on:
These will be the Socks of Kindness and I'm making them with the Periwinkle Sheep Watercolors sock yarn in the Rhinebeck 2011 colorway.
And finally, I started the Sycamore Vest by Hannah Fettig using the Cascade 220 Sport:
I thought it would be a great springtime piece.
Here's my problem now: I've started two more things. I have many other things started. Those of you who are knitters will likely be able to relate. So, I feel the need to come up with some sort of plan. Something like.... work on these for a little bit, then work on something already started. Like my Dahlia Cardigan. Which i love! And I've only gotten the back lace piece done. And my Froot Loop socks. I love them too! And of which I have the leg of one sock done. And my Umaro blanket by Jared Flood. I have almost one repeat done of that. And I love it! But I love these new things too. Ugh! Decisions decisions. Any suggestions?
I also read two books recently but will save those for the next post since this one is already ten years long.
Happy New Year!
Here's my problem now: I've started two more things. I have many other things started. Those of you who are knitters will likely be able to relate. So, I feel the need to come up with some sort of plan. Something like.... work on these for a little bit, then work on something already started. Like my Dahlia Cardigan. Which i love! And I've only gotten the back lace piece done. And my Froot Loop socks. I love them too! And of which I have the leg of one sock done. And my Umaro blanket by Jared Flood. I have almost one repeat done of that. And I love it! But I love these new things too. Ugh! Decisions decisions. Any suggestions?
I also read two books recently but will save those for the next post since this one is already ten years long.
Happy New Year!





















